Perkins, 3.152, Technical features, Parts illustrations

How to renew an atomiser

1000 series » How to renew an atomiser

Cautions:

  • Atomisers must be removed and fitted by a person with the correct training.
  • Do not allow dirt to enter the fuel system. Before a connection is disconnected, clean thoroughly the area around the connection. After a component has been disconnected, fit a suitable cover to all open connections.
  1. Remove the fuel leak-off pipe.
  2. Remove the union nuts (A1) of the high-pressure pipe from the atomiser and from the fuel injection pump. Do not bend the pipe. If necessary, remove the pipe clamps.
  3. Remove the atomiser setscrews and remove the clamp (A2), the atomiser (A6) and its seat washer (A7). Remove the dust seal (A5) and the spacer (A4) and fit the spacer and a new dust seal onto the new atomiser.
  4. Caution: Remove and discard the seat washer (A6). If the original seat washer remains in the recess for the atomiser, the nozzle protrusion will be incorrect when a new seat washer is added.

  5. Put the new atomiser in position with its spacer, new dust seal and a new seat washer, ensure that the fuel leak-off connection (A3) is not toward the engine. Position the clamp and engage the atomiser setscrews. Ensure that the atomiser is not tilted and tighten the setscrews for the clamp evenly and gradually to 12 Nm (9 lbf ft) 1,2 kgf m.
  6. Caution: Do not tighten the union nuts of the highpressure pipes more than the recommended torque tension. If there is a leakage from the union nut, ensure that the pipe is correctly aligned with the atomiser inlet. Do not tighten the atomiser union nut more, as this can cause a restriction at the end of the pipe. This can affect the fuel delivery.

  7. Fit the high-pressure fuel pipe and tighten the union nuts to 27 Nm (20 lbf ft) 2,8 kgf m. If necessary, fit the pipe clamps.
  8. Renew the sealing washers and fit the leak-off pipe. Tighten the banjo bolt to 9,5 Nm (7,0 lbf ft) 1,0 kgf m.
  9. Operate the engine and check for leakage of fuel and air.
Inapoi Seria motor Perkins 1000 series
Noul buldozer dispune de un motor de 634 kW (850 de cai), de lame ce se pot deplasa până la 43,6 mᵌ și constructorii indică o greutate de serviciu de ceva mai mult de 112 de tone. Noua motorizare permite modelului să răspundă exigențelor normelor americane Tier 4 al EPA. Emisiile de oxid de azot în
mai multe detalii ...
Technical features, Parts illustrations, 3.152, Perkins
Stivuitorul TELESCOPIC JCB 550-80 va fi ideal pe santiere sau in industrie. Acest stivuitor de santier permite manipularea unor incarcaturi de 5 tone. La inaltimea sa maxima, putin mai mult de 8 metri, poate ridica pana la 2,5 tone. Noul stivuitor de santier TELESCOPIC 550-80 de la JCB este echipat cu un sis
mai multe detalii ...
Parts illustrations, 3.152, Perkins, Technical features

Sediu : 700045 Iasi, Strada Sfantul Lazar nr. 27, Kapital Invest Building -  etajul 2
Depozit :
700382 Iasi,Str. Aurel Vlaicu 88
600343 Bacau,Str. Letea 32
062202 Bucuresti, Str. Preciziei 32
2059 Chisinau, Str. Petricani 19/4

Societate aflata in insolventa prin hotararea Tribunalului Iasi din 21 martie 2025, dosar nr. 1116/99/2025

Telefon Romania:

+40 743 122 261
office@commatech.ro